Most viewed - Chok Dee #2 |

Drainage Openings61 viewsThe larger 3 inch PVC piping is used to set in periodic drainage openings within the front exterior wall. The larger diameter is more practical as the holes will tend not to jamb as often and are easier to maintain. dozer
|
|

Pipes after Floor Pour60 viewsA view of the bathroom floor pvc drain pipes + inbound water pipes after the bathroom floor has been poured. There are 2 floor drain pipes, a solid waste drain pipe, a sink drain pipe, and three inbound water pipes. dozer
|
|

Junction Box60 viewsThe view of an electrical junction box in the attic. Note that the electrics are securely fastened with plastic affixers which ensures full protection of the electric wires.dozer
|
|

Wall Columns60 viewsAs always, the columns for the perimeter wall are poured after the blocks are laid. This ties the blocks into the column and is much more durable.dozer
|
|

Rendering Rod60 viewsThe rendering rod is used to level off the applied aerated block rendering compound after it has had time to set. dozer
|
|

Patio Pour60 viewsShows the pour of the patio area. The columns are protected during the pour as cement and other discolorants are hard to clean off the stone facing. dozer
|
|

Stone Trim60 viewsA close up of the red stone trim applied to the exterior patio columns. This is affixed with a adhesive cement product.dozer
|
|

Ceiling in Kitchen60 viewsThe ceiling in the kitchen after the installation of the trim wood.dozer
|
|

Grouting the Patio60 viewsA premium grout (mold resistant) was used throughout the house.dozer
|
|

Exterior Gutter59 viewsThe exterior gutter being smoothed after being poured. dozer
|
|

Wall Cleaning59 viewsSpots from construction debris can be washed off the colored concrete using water and a pad.dozer
|
|

Palms Planted59 viewsA bit of a garden on the right side of the driveway.dozer
|
|