Home > House Construction > Chok Dee #2

Most viewed - Chok Dee #2
IMG_9785.jpg
Bedrooms63 viewsThere are two bedrooms of the identical size, 3.5 by 4.5 meters (15.75 square meters) - which is pretty roomy. Each room has 2 large windows and the designated master is wired for A/C. dozer
IMG_9058.jpg
Archway, Left Section62 viewsA view of all three of the archways.dozer
IMG_9021.jpg
Top of Archway62 viewsNotice that top of the archway is being done in red bricks. Also note the vertical lengths of rebar spaced evenly and affixed to the box section at the top as a supporting framework for the archway structure. dozer
IMG_9062.jpg
Septics after Pour62 viewsThe service openings are placed to be level with the walkway. dozer
IMG_9371.jpg
Gate Rail62 viewsThe rail for the gate is laid in place The rail must run level and equidistant from the wall to ensure easy opening and closing of the gate. The rail will be concreted into place. It is strip of 1.5 inch angle steel with a 12 mm round steel rod welded on top. Two sets of two large 4 inch wheels (total of 4) with an indentation will be affixed to the lower edge of the gate, the wheels are grooved to run along the rod. dozer
IMG_9425.jpg
Painting Door Trim62 viewsThe door frame being painted. The sides are properly masked prior to painting. dozer
IMG_9397.jpg
Counter Prep for Granite62 viewsThe counter is being prepped for laying in the granite slabs. dozer
IMG_9464.jpg
Tile Cutters62 viewsTile cutters make a smoother cut than a grinder but are often not used in other projects.dozer
IMG_8851.jpg
Drain Pipe Test61 viewsDrain pipes are also tested against concrete contamination if they have ever been left uncapped, prior to the external wall being laid. dozer
IMG_8679.jpg
Pipes Capped61 viewsNotice that in this shot the damp course has been put in place along with the support rebar for the floor pour. All drain pipes + inbound water pipes have been properly 'capped' (see the end of the PVC pipe) with a removable 'hat'. This will prevent any concrete contamination from entering and restricting flow within the pvc piping during the construction process. dozer
IMG_9713.jpg
Service Opening Water Tank61 viewsThe finished and plumbed water tank with the automatic pump on top. dozer
IMG_9283.jpg
Driveway Pour61 viewsIn preparation for the driveway pour the surface is leveled for the correct sloping angle and then the frame mesh is put in place at intervals of 20 centimeters. The red bricks are used as spacers. The pour will be 10 centimeters in depth. dozer