|
Most viewed - Chok Dee #2 |
Septic Service Opening67 viewsThis shows the type of opening used for the 3 septic collections within the system. It is a threaded 6 inch brass lid fitted into a heavy PVC shell. This will be placed on top of the 4.5 inch hole in the lid of the concrete rings. dozer
|
|
Sika Water Proofer67 viewsSika 'gan sum' waterproofing agent is added to the concrete mix.dozer
|
|
Kitchen Painting67 viewsThe kitchen being painted. The paint used was super shield (both primer and the finish coat). The kitchen and bathroom are semi gloss (washable) while the rest of the house are done in matte. dozer
|
|
Counter Tiles67 viewsThe kitchen cabinet tiles are off white tiles spaced at 3 mm intervals. dozer
|
|
Removal of Plastic Sheeting67 viewsThis stuff is great, look, no spots!dozer
|
|
Granito Tiles67 viewsThe granito tiles used in the front room and thicker and heavier than normal ceramic tiles. dozer
|
|
Finished and Grouted Bedroom Tiles67 viewsdozer
|
|
Window Opening being Squared66 viewsHere the opening is in the process of being squared. dozer
|
|
Kitchen Cabinets Formation66 viewsShows the kitchen cabinets which are constructed of red bricks being formed. The walls of the kitchen have been roughed to 1.5 meters to allow for the wall tiles. dozer
|
|
Shower Enclosure66 viewsThe shower enclosure showing the blue glass blocks laid in place to be flush with the ceramic tile finish upon completion. dozer
|
|
Archway65 viewsOnly the bottom portion of the archway is actually poured. The top of the archway (as seen to the left) will be continued using red bricks and mortar. dozer
|
|
Framing for Top of Enclosure65 viewsThe framing for the top of enclosure. Notice the rebar lattice with spacing of 20 centimeters. The lid/service opening is sized at 50 centimeters by 50 centimeters. There is an entry pipe, water level solenoid pipe, and exit pipe (to feed to the automatic water pump into the house). dozer
|
|
208 files on 18 page(s) |
|
|
|
|
|
10 | |
|
|
|
|
|
|
|