14 Jan 2009188 viewsHere we see more evidence that the Beamteam is still working and not sleeping under the shade of the old oak treepklongball
|
|
13 Jan 2009188 viewsThis view in the early stage of steel forming we can see pretty clearly the 16 mm steel used in the floor beam supports.pklongball
|
|
Valentine's Day 2009188 viewsSo we now have a poured floor and this brings an end to this phase of the build. Next week brings the beginning of the roof steel work and maybe morepklongball
|
|
26 March 2009188 viewsAnd here we have a section that is ready for the cables. 4 conduits were bent using a heat gun,,,yes I said heat gun not lighter or some sort of fire on a stick, then attached to holes cut into the bottom of the channel. And the use of the connector and bushings is another requirementpklongball
|
|
1 April188 viewsSome more of the electricians handiwork. All the boxes he installed today come up the wall and join the raceway above the kitchen ceiling.pklongball
|
|
1 April188 viewsThis is Sparky's first real brain fart of sorts. Several outlets and switches are going in this wall and there is no wall yet so he chose this method to get his part done and let the wall guy fill in around the stuff. It's not pretty but it will work and when the walls are finished you'll never see this,,,so mai phen raipklongball
|
|
28 March 2009188 viewsThis roof valley will be completed in short order and should have a nice tight fit of tilespklongball
|
|
|
|
2 May188 viewsI think I posted this photo once but just in case here again is the septic tank and the drain pipes from the housepklongball
|
|
188 viewsthe last meal with buildersgeordie
|
|
June 26188 viewsWindow man came out and installed all the slider windows and one door. They are really pretty nice.pklongball
|
|