238 viewsExterior now rendered and primer applied. Now adding bricks to the columns to increase the size. This was going to be the car port but will now be another patio (or GRAND entrance if I want to be a snob)Thaifu T
|
|
|
UGLY!238 viewsChinese owner must founded really cheap paint :(
This is sitting opposite of our house...!pskog
|
|
thaiflys grass and sprinkler system238 viewsback elevationthaifly
|
|
Starting the Roof Panels238 viewsAlthough you can't see it in this picture, we used standard 50x150 composite panels, but had them cut in half (75cm length) to give them a better look (more like the smaller concrete roof tiles). Since the labor contract was fixed-price, our only extra cost in doing this was that we needed twice as many fastener hooks. No extra steel was required.DrDave
|
|
|
|
beams poured237 viewsOur floor will be about 1 meter off the ground. These are the footings for the floor.somdet
|
|
West-facing wall.237 viewsThis will be poured cement.somdet
|
|
9 March 2009237 viewsMoving the blocks from point A to point B is backbreaking and sweaty work and always the ladies get this job.pklongball
|
|
|
|