more land53 viewsthe filled in block. the tractor is parked in front approx of the old pond. krisb
|
|
|
|
|
main line awaiting electric company hook up53 viewsin the same vein. last time main wire was left exposed it was stolen resulting in a 29,000 THB replacement cost, yet they never learnShastadad
|
|
the workers refused to do anything about the location problem because of the "black" pipe53 viewsShastadad
|
|
oversized rain gutter53 viewsbuilder placed the back porch roof line too close to the rear boundaryShastadad
|
|
kitchen complete53 viewswas impressed that the tiler was able to curve tiles to match outline of hoodShastadad
|
|
Land before the build (12 10 2010)53 viewsThis is what we had to work with. fgrossiii
|
|
Bottom foundation 10cm with reinforcement grid53 viewsKlondyke
|
|