|
Most viewed - User galleries |
|
|
buildingsite57 viewsthe sticks for the hootings have been put in place.sjeng
|
|
Three Weeks and front to Back View57 viewsSo we are now three weeks into the build and the landscape is starting to change already. As you can now see the cement mixer is now well and truely broken in and dirty.changnoi
|
|
Central Walkway Showing Columns & Formwork57 viewschangnoi
|
|
|
Foundation of pier57 views1 cubic metre of concrete was poured into the foundation, the rebar cage was set, and the first concrete pipe as lowered into position. By next morning is was all dry. Max&Bee-in-CM
|
|
|
|
add den room57 viewsfoundation columns digging simple foundation ROT: remove weight of old soil = load on column do not count unconsolidated soil weight then is rock solid way to exsure no crack no settling unless u build in quick sands & if do quick sand build use pile to depth 1st consolidated layerotis-a
|
|
column forms57 viewsnormal steel cement const. chaing raiotis-a
|
|
|
5254 files on 438 page(s) |
|
|
|
|
|
270 | |
|
|
|
|
|
|
|