446 viewsWorking on the columns for the entrance. Weatherboard now fitted to the roof.Thaifu T
|
|
|
|
|
444 viewsPre-stressed floor slabs for the first floor are being delivered direct from the factoryRick B
|
|
The process have started443 viewstrehanse
|
|
443 viewsFirst floor beams are ready for the floor slabs (pan peun)Rick B
|
|
Side Deck Roof442 viewsWork on the side deck roof support steel is now underway. This roof will also extend to the rear of the house to cover the outdoor Thai kitchen.Rick B
|
|
Consumer Unit medium440 viewsConsumer Unit (pre equipped), steel box, for 4 circuits, eg; Lighting, wall sockets, water heater, air con.
Brand: Safe-T-Cut
Equipment: 2-pole 32A master, minature RCBO with variable senitivity, 2 16A MCBs, 2 10A MCBs
Price: about 1,800 bahtjazzman
|
|
Locking door knobs438 viewsStandard Thai style locking doors knobs. These cost 250 baht from HomePro. There are cheaper ones, and I have seen cheaper ones installed in multi-million luxury homes in developments on Samui.jazzman
|
|
436 viewsColumns have been poured from the footer up to just below the first floor elevated beams. Rebar for beam to hold wall surrounding the crawl space is also being assembled.Rick B
|
|