18 May78 viewsThe tilemen have moved out to the back veranda over the weekend and have most of the floor done now on Mondaypklongball
|
|
18 May78 viewsThis is the coil of wire used as the pulling wirepklongball
|
|
June 778 viewsMore of the crew adding the sand wash to the rear stepspklongball
|
|
Electricity Pole78 viewsFirst thing is we need power, so the electricity truck installs a pole. (cost = 3000 B)Max&Bee-in-CM
|
|
Lunch Time78 viewsOne of the Myanmar workers gathers grass to make fried vegetables.Max&Bee-in-CM
|
|
the plot with simple layout78 viewsthe plot accquired due to proximity to family, later was added fill (abt. 1.3m) & set 3 moons or 5 rains for consolidation. A bit of consternation but upon seeing construction, no worries. Seems the area norm. P/L = property line, Fill=area filled to elevate above road and drain ditchesotis-a
|
|
the Thai family area78 viewssmak dab across field is big Aunty hse, up horizontal road by 3 houses is MTW family & all around r cuz's. So lots of SadiKa's between Aunty hse & the site. Sized based on Auntys' but went to two floors so room space about same but leaves some area to park, keep chickens, barbque, and maybe garden. Sized by tile count at 1/3 m per tile. Story goes Aunty wanted this plot but owner no sell at that time.otis-a
|
|
Rebar columns78 viewsThe support columns are ready to be put into place.Max&Bee-in-CM
|
|
Concrete truck78 viewsWe used a local company called PPS, concrete was excellent quality, and the service quick and stress free.Max&Bee-in-CM
|
|
|
PPS concrete truck78 viewsThe truck from the local companyMax&Bee-in-CM
|
|