8 May81 viewsAn over head shot of the small bathroom and the now almost finished wall tiles. We decided today to add one more row on the top to make the ceiling a little higher. Finished height will be 2.75 meters.pklongball
18 May81 viewsHere we have a below ground level shot of the pipe trenchpklongball
20 May81 viewsAnother angle of the tile in the bedroompklongball
23 May 200981 viewsMore of the trimwork for the veranda.pklongball
June 1281 viewsWe decided to install a rain gutter to the roof line around the read veranda. Huge amounts of rain came off this roof and down the long valley. It is stainless steel and has been painted with a primer so we can match the trim colorpklongball