happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries

Most viewed - User galleries
P6222453.JPG
June 2284 viewsToday the painting crew started the inside paint. Before they began they used some masking tape to protect the wood. I don't know how well the tape shows in the photos here and other pagespklongball
P6302559.JPG
June 3084 viewsA little closer look shows Sparky making the wiring connections using wire nuts.pklongball
first_attempt_at_sandstone_blocks_i_dont_think_so_4.jpg
First attempt at sandstone cladding84 viewsNot quite what we had in mind so down it comes and start againchangnoi
DSC_0646.jpg
84 viewsrucus7
T_house_March_2010_192.jpg
Downstairs Bathroom84 viewsIndoor/Outdoor bathroom. I first saw this stainless steel rain shower spiral, in a magazine in Abu Dhabi where they were asking $2000USD. I tore the page out of the magazine and took it back to the local marina in Phuket where I kept my boat. I had the guys in the stainless steel shop fabricate it for me. My cost: 2,000 Baht. The 500 Baht shower curtain hangs on the stainless steel pipe.
Stairs are solid teak with 25 coats of "Deks Olje" (Aquired at the local marina)
verticalift
T_house_March_2010_137.jpg
Front of Townhouse 201084 viewsFront of Townhouse on one of Phukets Golf Courses.verticalift
IMG_3543.JPG
Laying out the house on the land84 viewsthe yellow soil in contrast to the rice fieldMax&Bee-in-CM
IMG_3984.JPG
Work bench84 viewsVery functional, and looks great too. made from all natural materials.Max&Bee-in-CM
IMG_4426.JPG
Concrete foundation84 viewsConcrete poured for foundations and being setMax&Bee-in-CM
IMG_4423.JPG
Concrete foundation84 viewsColumn rebar set inside the concrete pourMax&Bee-in-CM
IMG_5269.JPG
Formwork building84 viewsMax&Bee-in-CM
IMG_5744.JPG
Truck is pouring concrete for the columns84 viewsA small human bucket chain is formed to bring the buckets to the top of the columnMax&Bee-in-CM
5254 files on 438 page(s) 203

Debug Info 
Debug Output: show / hide