mURI_temp_b2d15a6a.jpg
89 viewschiangmaiexpat
mURI_temp_48431671.jpg
89 viewschiangmaiexpat
Vy_fran_sov_rum_A1_PICT8346_(Medium).JPG
89 viewsView from house A1 30 meters from the beachzappa
PICT8355_(Medium).JPG
89 viewszappa
P5182237.JPG
18 May89 viewsSparky is feeding into the 2 inch pipe a piece of stiff wire that will be used as the pulling wire for the NYY cablepklongball
P5192243.JPG
19 May89 viewsHere we can see the NYY cable and the now attached pull rope.pklongball
P5212271.JPG
21 May89 viewsThis is a view that you don't see every day. Sparky is up on our pole and he is adding some steel brackets and U bolts to secure the PVC and the PE pipe to the pole. He asked me if I wanted this and I of course said yes. This type of thing will also be used under the house in the crawl space where the PE comes up from the trench and goes to the load center conduit under the floor.pklongball
P5312329.JPG
31 May89 viewsThe kitchen floor is about 80 percentpklongball
DPP_0042.JPG
89 viewslast of the driveway concretegeordie
DPP_0041.JPG
89 viewsa three meter truck i did when i had nearly finished find a six meter for next timegeordie
P6122397.JPG
June 1289 viewsNow the second bath floor is almost finished. Just some grout work to do.pklongball
P6282551.JPG
June 2889 viewsHere is the first load of gravel that will line the driveway. I am expecting two trucks for sure and maybe a third. The dirt man will decide if the 3rd is needed when he levels it and compacts it.pklongball