|
Most viewed - User galleries |
|
8 May95 viewsWe can see here a view of the half walls in the master bathroom. We thought this would be a nice feature to keep most of the water in the shower. Have not decided if a glass door will be bought. Most likely not until after I win the lottery.pklongball
|
|
19 May95 viewsThe two PE pipes that will have the main supply cable and the telephone cable pulled in. We will have two phone cables in the smaller one along with an extra pull wire for future cable TVpklongball
|
|
23 May 200995 viewsThe prep work and first paint applied to the back gablespklongball
|
|
June 2895 viewsGravel truck one of threepklongball
|
|
11 October95 viewsA view looking at the layout for the walkway we will pour from the house to the laundry/pump room and also back to the back yard area.pklongball
|
|
Jan.29,201095 viewsJust more of the final drilling processpklongball
|
|
Jan.30,201095 viewsThen about 25 or 30 meters of pvcpklongball
|
|
|
Raising the rebar95 viewsHave to keep the rebar off the ground so it doesn't rust as muchMax&Bee-in-CM
|
|
Deep holes95 viewsFoundations holes are 2 metre deep.Max&Bee-in-CM
|
|
|
5254 files on 438 page(s) |
|
|
|
|
|
180 | |
|
|
|
|
|
|
|