11 May103 viewsA not to close view of the newly installed cabling for the 3-phase hookup we will have in a month or two. Sparky called in the local PEA inspector to look over the house wiring and it just so happens that this guy also moonlights installing pre-meter install wiring. So now we have this covered and when the main connect is need we already have his approval so one step closer to having power.pklongball
11 May103 viewsA more distant shot of the cabling installed for the 3 phase power and meter. The closer pole is the pole we installed for our connection. The pole opposite is the project installed pole. We had to have the cabling and pvc installed to get ready for the new meter in a month or two.pklongball
103 viewsa better view of what i had to work around the house was suposed to have gone befor i got theregeordie
June 26103 viewsThe view of the pump house today.pklongball
July 10103 viewsNow we have the mirror and bath vanity light. We found this fixture at a specialty lighting shop in Rayong. It has 4 12 volt halogen lampspklongball