3 Column Hole146 views2 Jan. '09 View of a larger hole being prepared for 3 footings and columns. The bottom of the hole is covered with a layer of concrete.pklongball
|
|
22 Jan 2009146 viewsThe concrete trucks arrive and the beam pour beginspklongball
|
|
9 May 2009146 viewsThe end of the drains dump the grey water into the street storm drains to be carried away to who knows where. Most likely into the nearest creek and then to the sea.pklongball
|
|
10th October some more preperation146 viewsFront wall completely gone along with gate and old water tank. In the middle ground left hand side you can see the topp of the well which we are going to use for when the council supply fails. It will get plumbed into the watertank along with a pump. We saw a great square water tank, looks like brick at HomePro, made by DOS. Sadly only 900 litres whereas we could do with one that is 1200.changnoi
|
|
back porch bench railing145 viewsTried to think of a better word for this, but couldn't. It's where I'll be a-settin' of an evenin'. Poured cement will be finished with tiles.somdet
|
|
The Girls' view145 viewsout their bedroom window. That dirt will eventually be a vegetable garden and lawn.somdet
|
|
|
|
|
Water main & construction power145 viewsJust after land transfer the project saw the government water main installation so we may have a meter installed before we begin mixing cement. We also had the PEA install a temporary meter for our electric needs during the build.pklongball
|
|
50 percent of the wall145 viewsHere we see two side walls built with the back and front yet to go. The price of the plot included a complete wall and gate. It is the poorest, cheapest wall money can buy but if it lasts a couple of years I'll be happy.pklongball
|
|
Rebarman 3145 views4 Jan 09 This guy was wearing a so called safety hat. I guess he's worked with the other guys before and needs the hat?pklongball
|
|