happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries

Most viewed - User galleries
P2081756.jpg
Overview Front167 views We are almost ready to pour the CPAC concrete floor and end phase one of the build.pklongball
P2141776.jpg
Valentine's Day 2009167 viewsThis is almost noon on Saturday after the finish of the floor pour on Friday. The builder will have someone on site watering down the concrete to keep it drying a little slower pklongball
P2211801.jpg
21 Feb 2009167 viewsThe builder decided we needed the steps built now as opposed to waiting. I agreed as now we will have a way to get from the ground to the floor area without the need for makeshift ladders and stuff.pklongball
DSC00681_(Medium).JPG
167 viewszappa
P3231924.JPG
23 March 2009167 viewsThe other side of the bed gets a switch and plug in the same box . Most bed lamps only have a 2 bladed plug so I thought a good deal here.pklongball
100_0250.JPG
166 viewsSomething I hadn't picked up from the original plans. Patio is 40cms below the house floor level. Having this raised so the drop is only 10cms. Some sort of drop is recommended to cater for the wet season.Thaifu T
100_0267.JPG
166 viewsGeneral view of the house looking north - this was taken on Christmas DayThaifu T
IM000578.jpg
pouring the cement porch bench railing dealieo166 viewssomdet
IM000699.jpg
The kitchen counter166 viewssomdet
03210003.JPG
166 viewsCookieboy
P1291715.JPG
29 Jan. 2009166 viewsOverview of the site just after the first delivery of floor panels.pklongball
P2131775.jpg
Friday the 13th166 viewsThe reflection off the fresh concrete.pklongball