More superb engineeriing.1359 viewsClick the image for a full screen view. A load-bearing concrete corner column. Notice how the whole weight of the corner of the roof rests on the too thin rebar of the columns that were made too short. The ring-beam is only a single c-section 4 x 4 steel girder; it should at least be a box section - better would bee two C-sections welded face-to-face. Viewed from the outside, the tiles lifting up a couple of milimetres at their bottom edges demonstrates that the roof is sagging already.jazzman
|
|
Strong Roof Truss...1157 viewsClick the image for a full screen view. The double-C ridge purlin - the most important load-bearing part of the roof - was too short so they just extended it with a bit of rebar and connected all the hip purlins to it. Notice the superbly clean welding and the neat job of repainting the welds.
Only about one in six of the tiles had been tied down, the rest were just in place under their own weight. Hopefully this region of Thailand is not susceptible to high winds.jazzman
|
|
Very nice bathroom finishing1086 viewsClick the image for a full screen view. They must have broken a corner off the expensive black marble top and hastily repaired it like this.
An electric socket this close to the washbasin is TOTALLY inadmissible.jazzman
|
|
Quality wiring1005 viewsThis is a major wiring junction in the roof space. Wires twisted together with insulating tape and no junction box.jazzman
|
|
DISASTERS !!!1000 viewsThese are some of the things that W I L L happen if you go away and let the builders get on with it under the expert supervision of your Thai partner, your inlaws, or just with no supervision at all. People with pots of money can just laugh these things off. In the worst case sceneario, the cost of putting it right may be more than what is in your retirement fund .jazzman
|
|
'Waterproof' connections.964 viewsThis is a picture of a swimming pool 'deck box' that provides the connection of the underwater light unit cables to to cables to the transformer. The cables are supposed to be joined with proper waterproof connectors and/or shrink tube. These were just twisted together with normal insulating tape. These deck boxes will inevitably get filled with water...
jazzman
|
|
More neat finishing936 viewsWhat the blanked-off hole was supposed to be is anyone's guess. And of course there should not be an unearthed 2-pin socket here. One wonders if there is even an earth wire in the 3-pin sockets. You can guess...jazzman
|
|
Neat finishing878 viewsNeatly finished switch unit. Notice the blobs of white paint ion the switches.
jazzman
|
|
wall 5732 viewsThen it fell over. One night of rain was enough. This wall will be rebuilt using correct engineering and correct drainage. Another 40 trucks of dirt will be needed to top up the infill that was washed away. Probable total cost: around 250,000 baht.jazzman
|
|
wall 4704 viewsWet dirt is a viscous mass far heavier even than the water in a swimming pool, and exerts even more pressure on the surrounding walls.
A rogue bnuilder charged about 180,000 baht for this wall.jazzman
|
|
Wall 1690 viewsA perimeter wall might not just be for decoration.jazzman
|
|
wall 3668 viewsIf a perimeter wall is to be used for retaining fill dirt, it needs some careful consideration. This wall is (was) 100 x 20 for 1 metre of in-fill.
Think about the 20 cm thick, steel reinforced walls of your tiny 4 x 8 swimming pool...
jazzman
|
|
|
|
|
|