Most viewed - Main Structure |
62 viewsThe external bathroom footing with the rebar footing pad in place. dozer
|
|
62 viewsThe footing for the bathroom. The ground beam will be on top of this.dozer
|
|
59 viewsThe form for the ground beam. The ground beam is dug out and formed using concrete blocks. The blocks will be left in the floor. dozer
|
|
58 viewsAnother shot showing the pour of the ground beam. The prefabricated columns have holes which allow the rebar to be affixed to the ground beam. You can see the rebar producing from the column at the 12 o'clock position. The columns are arowan block brand (premium). dozer
|
|
57 viewsAt this stage the roofing has been done (notice if it was heavy roofing the walls would be completed first). dozer
|
|
56 viewsInterior wall with electric sunken electric junction box. One row above the box there is a poured ring beam to add strength. dozer
|
|
56 viewsSide view of the house, still partially finished. The bathroom is in the rear (with two glass blocks). dozer
|
|
54 viewsThe exterior prior to rendering the surface. dozer
|
|
53 viewsMore work on the roof. The cross members are set in place. The helper in blue is holding the ground while the foreman welds. dozer
|
|
52 viewsThe interior after the pour of the floor and walls rendered. The floor was poured 8 - 10 cm and broomed rough in preparation for floor tiles. dozer
|
|
52 viewsApproximate wall thickness after rendering, about 8 cm. dozer
|
|
50 viewsHere the foreman is doing the roof structure. The apex of the column is 4 meters (as can be seen imprinted on the top of the column) and is underground about 1 meter leaving about 3 meters. The stick is being used temporarily level the upper room beam. dozer
|
|
|
|
|
|