Home > House Construction > Chok Dee #2 > Finishing

Most viewed - Finishing
IMG_9768.jpg
Grouting the Upper Edge of the Wall Tiles68 viewsApplying grout to the often overlooked upper edge of the wall tiles. If not grouted these will collect moisture in the open pockets and over time the tiles will become loose. dozer
IMG_9385.jpg
Kitchen Painting67 viewsThe kitchen being painted. The paint used was super shield (both primer and the finish coat). The kitchen and bathroom are semi gloss (washable) while the rest of the house are done in matte. dozer
IMG_9468.jpg
Counter Tiles67 viewsThe kitchen cabinet tiles are off white tiles spaced at 3 mm intervals. dozer
IMG_9724.jpg
Removal of Plastic Sheeting67 viewsThis stuff is great, look, no spots!dozer
IMG_9659.jpg
Granito Tiles67 viewsThe granito tiles used in the front room and thicker and heavier than normal ceramic tiles. dozer
IMG_9653.jpg
Finished and Grouted Bedroom Tiles67 viewsdozer
IMG_9195.jpg
Kitchen Cabinets Formation66 viewsShows the kitchen cabinets which are constructed of red bricks being formed. The walls of the kitchen have been roughed to 1.5 meters to allow for the wall tiles. dozer
IMG_9224.jpg
Shower Enclosure66 viewsThe shower enclosure showing the blue glass blocks laid in place to be flush with the ceramic tile finish upon completion. dozer
IMG_9412.jpg
Faucet Holes65 viewsThe faucet holes are drilled on site by the granite people. A special bit is used and water is poured during the during the drilling process to avoid having the granite surface crack. dozer
IMG_9317.jpg
Painting the Patio Ceiling64 viewsThe patio ceiling is made of the water resistant drywall plasterboard. Here a primer coat is being applied. dozer
IMG_9440.jpg
Wood Trim being Applied64 viewsWood trim being applied to the corner section of the tiered ceiling. Glue is applied to the underside of the trim prior to nailing in place via an air gun. dozer
IMG_9402.jpg
Slab put in Place64 viewsHere the granite slab is set into place. The holes and edges are cut at the stone factory. The sinks were used by the factory to guarantee a perfect opening for the under mount sinks. The faucet holes will be drilled on site.dozer