Most viewed - Finishing |
Shower Enclosure Upper Edge138 viewsThe upper edge of the shower enclosure, grout being applied.dozer
|
|
Glass Block Spacers122 viewsThe glass blocks are cemented in place using spacers (either wood or plastic) to guarantee uniform spacing. On the right and left notice the fish line true lines to aid in achieving straightness. A rebar strip (6 mm) is laid horizontally on every other row to add strength.dozer
|
|
Patio Getting There82 viewsA view of the site at this late stage. Chaos started to subside.dozer
|
|
Bathroom Sink Counter76 viewsPreparation for the pour of the bathroom sink. The same method is used as in the kitchen counter, the rebar used in the 6 mm thickness. The concrete will not be poured in the circular area where the sink will go and an open area will be left for the faucet. dozer
|
|
Kitchen Tiles Diamond76 viewsThe kitchen, patio and bathroom tiles are laid in angled by 45 degrees within an outer border.dozer
|
|
Nearly Finished Counter Cabinets75 viewsThe counter nearly finished. dozer
|
|
Front Room being Tiled75 viewsdozer
|
|
White Aluminum Window Frames72 viewsThe windows opening are measured and the frames are then installed to fit. This is the more expensive 1.2 mm thick white aluminum. Note that most installations do not use the frame piece, which adds to the durability + is a decorative addition.dozer
|
|
Gate Being Welded71 viewsThe gate being welded. dozer
|
|
Aluminum Door70 viewsThe heavy duty aluminum door being fitted into place. This is a swing type door. dozer
|
|
Kitchen Counter69 viewsRebar meshing in the counter is laid in a 10 centimeter square mesh. Concrete will be poured in the forms to make the counter. There will be a place holder for the sink and faucet (on the right). dozer
|
|
Counter after Pour69 viewsThe bathroom counter after the pour. The faucet will set off to the right side of the sink where the PVC pipe is. dozer
|
|