|
Most viewed - Main Structure |
Pour of Archways76 viewsThe archways are formed using plywood forms (as shown). The base of the form work is rounded pieces of plywood supported by 2 x 3 inch wood strips. dozer
|
|
Window75 viewsA window showing a horizontal ring beam underneath it, lintel/beam on top and vertical beams to either side. The picture is at an odd angle, the window is perfectly true (but doesn't look like it in the pic). dozer
|
|
Squaring Off the Window Openings72 viewsThe window and door openings are squared off after being initially roughly finished. It is after this process that they will be the correct size and position. dozer
|
|
Bathroom Door after Pour of Vertical Beams71 viewsThe bathroom door after the vertical beams were poured.dozer
|
|
Lintel Pour above the Bathroom Door70 viewsHere the lintel is being poured about the bathroom door, and will be continued to the right to form a horizontal ring beam. dozer
|
|
CPAC Compressive Strength Certification70 viewsA portion of the certification that the samples were tested and the corresponding results. The status field indicates 'p'ass or 'f'ail and the stress column indicates the amount of stress the samples withstood. In this case the 280 ksc samples withstood a minimum of 340 ksc prior to failure. dozer
|
|
Bathroom Door Frame68 viewsNotice the external bathroom wall. The door frame is affixed in two vertical beams + there is the associated lintel beam on top of the door frame. The extended beam is necessary due to the height of the wall. dozer
|
|
Window Opening being Squared66 viewsHere the opening is in the process of being squared. dozer
|
|
Archway65 viewsOnly the bottom portion of the archway is actually poured. The top of the archway (as seen to the left) will be continued using red bricks and mortar. dozer
|
|
Archway, Left Section62 viewsA view of all three of the archways.dozer
|
|
Top of Archway62 viewsNotice that top of the archway is being done in red bricks. Also note the vertical lengths of rebar spaced evenly and affixed to the box section at the top as a supporting framework for the archway structure. dozer
|
|
Archway Completed Section on the Right54 viewsThe finished archway prior to rendering: notice the lower portion is poured within formwork and the upper portion is brick and mortar. The heavy lower portion is supported by a rebar strand framework which was welded on to the box section at the top. dozer
|
|
48 files on 4 page(s) |
|
4 |
|
|
|
|