IMG_8598.jpg
Proper Squaring170 viewsThe 3,4,5 is a redundant check to the diagonal check, but it can come in handy in certain situations where the diagonals cannot be easily accessed. I would note that most houses in Thailand are not 'square' because basic checks like these are not commonly done.dozer
IMG_8567.jpg
Sand Maintenance169 viewsThick plastic is used as a protective shield (against mixing with ground dirt) for sand and other aggregate.dozer
IMG_8601.jpg
Diagonal Checks for Column Placement162 viewsThe correct placement of columns is important to the overall project to ensure that the wall angles are as they should be and the house is as designed. Often the only tool used is an external measure + the use of a small square. This shows one additional check, taken from the 3 4 5 triangle rule. If you measure 3 meters along one axis and 4 meters along another axis the diagonal should be 5 meters (or in this case 6, 8 and 10). This is done in addition to measuring the diagonals for equality.dozer
IMG_9316.jpg
Black Plastic for Protection154 viewsHere the stone tiling covering the entry columns are being protected from paint splatter with black plastic. dozer
IMG_8783.jpg
Log Sheet154 viewsA log sheet is utilized to keep track of all materials and tools, indicating the amount received, amount used, purpose, by whom and associated date.dozer
     