happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2 > Finished Project

Most viewed - Finished Project
DSCN0491.jpg
Secured Storage61 viewsThe security partition to make a secured storage area. The partition is made of 1 by 1 lengths of metal welded into a mesh pattern.dozer
DSCN0484.jpg
Bathroom #160 viewsThe bathroom off the study area. The enclosure is 10mm glass / stainless custom made for around 15k from the same guy that did the aluminum windows.dozer
DSCN0489.jpg
Bathroom #260 viewsThere is a small granite sink unit in each bathroom. The sink is an under mount type.dozer
IMG_0164.jpg
Study59 viewsSmall sandstone tiles are used on the wall area of the study.dozer
DSCN0487.jpg
Bedroom58 viewsThe other side of the bedroom with the bathroom off to the right. The ceilings are stepped/trimmed in this room.dozer
DSCN0488.jpg
Bathroom #258 viewsShower enclosure the same as in bathroom number 1. dozer
DSCN0490.jpg
Secured Storage57 viewsA utility/secured storage room with a bunk bed in it. The roll up doors in this unit are split with a small and large section. dozer
DSCN0492.jpg
Ladder and Access54 viewsThe service entry access is on the ceiling with the wall mounted ladder providing access. The glass blocks are the oversized 30 cm x 30 cm variety. dozer
20 files on 2 page(s) 2

Debug Info 
Debug Output: show / hide