Most viewed - Feature Wall |
Lifting Mural into Place24 viewsLifting the engraving into place. dozer
|
|
Nearing Completion22 viewsThe engraving in place and most of the tiling complete. Notice the randomly placed square sandstone tiles and the finish where the tiles meet the wood trim. dozer
|
|
Completed Wall21 viewsThe completed wall with large sandstone engraving and small sandstone feature tiles.dozer
|
|
Decorative Standstone Carvings20 viewsThe small decorative sandstone 30 cm tiles (each under 200 baht) were placed in various locations on the wall. dozer
|
|
Partially Finished Wall20 viewsThe wall with the engraving in place and the lower portion of the sandstone tiling complete.dozer
|
|
Finish at adjacent Wall20 viewsThe corner was just painted to blend from the untiled wall to the tiled wall.dozer
|
|
Weber Tile Adhesive19 viewsThe weber tile adhesive is applied to prep the surface for the engraving.dozer
|
|
Prep Back of Mural19 viewsThe adhesive is applied to the back of the engraving. dozer
|
|
Large Sandstone Engraving19 viewsThese engravings come in various shapes and sizes, this one weighing 75kg brand name Melann (at the time 3 pc cost was 7500, one piece was 9500b). dozer
|
|
Engraving Frame18 viewsThe prepared frame for where the 75 kg. engraving will be placed.dozer
|
|
Finish at Wood Trim18 viewsThe tiler did a nice job finishing off the upper tile row next to the wood trim.dozer
|
|
The other Wall18 views dozer
|
|
|
|
|
|