Construction Photos
Home > House Construction > Cool Thai House Phase 2 > Feature Wall

Most viewed - Feature Wall
IMG_2760.jpg
Lifting Mural into Place24 viewsLifting the engraving into place. dozer
IMG_2783.jpg
Nearing Completion22 viewsThe engraving in place and most of the tiling complete. Notice the randomly placed square sandstone tiles and the finish where the tiles meet the wood trim. dozer
DSCN0343.jpg
Completed Wall21 viewsThe completed wall with large sandstone engraving and small sandstone feature tiles.dozer
IMG_2720.jpg
Decorative Standstone Carvings20 viewsThe small decorative sandstone 30 cm tiles (each under 200 baht) were placed in various locations on the wall. dozer
IMG_2767.jpg
Partially Finished Wall20 viewsThe wall with the engraving in place and the lower portion of the sandstone tiling complete.dozer
DSCN0340.jpg
Finish at adjacent Wall20 viewsThe corner was just painted to blend from the untiled wall to the tiled wall.dozer
IMG_2752.jpg
Weber Tile Adhesive19 viewsThe weber tile adhesive is applied to prep the surface for the engraving.dozer
IMG_2755.jpg
Prep Back of Mural19 viewsThe adhesive is applied to the back of the engraving. dozer
DSCN0348.jpg
Large Sandstone Engraving19 viewsThese engravings come in various shapes and sizes, this one weighing 75kg brand name Melann (at the time 3 pc cost was 7500, one piece was 9500b). dozer
IMG_2743.jpg
Engraving Frame18 viewsThe prepared frame for where the 75 kg. engraving will be placed.dozer
DSCN0341.jpg
Finish at Wood Trim18 viewsThe tiler did a nice job finishing off the upper tile row next to the wood trim.dozer
DSCN0342_edited-1.jpg
The other Wall18 views dozer