Home > House Construction > Cool Thai House Phase 2 > Cabinets

Most viewed - Cabinets
IMG_2796.jpg
Mounting the Upper Cabinets48 viewsStarting to Mount the Upper Cabinetsdozer
IMG_2813.jpg
Installing Shelving Unit48 viewsThe shelving units are installed with anchor bolts to the inside of the concrete structure. dozer
IMG_2393.jpg
Shelving Unit44 viewsThis opening is designed for another shelving unit (Kitchzo). dozer
IMG_2791.jpg
Hardware to Support Upper Cabinets44 viewsThe wall mounting to support the upper cabinets. The electric is for above and below florescent lighting.dozer
IMG_2327.jpg
Cabinet Walls43 viewsThe supporting walls for the counter are placed according to the design of where the lower doors will go. dozer
IMG_2381.jpg
Tiling Complete43 viewsThe tiling and grouting of the cabinets are complete. dozer
IMG_2338.jpg
Poured Concrete42 viewsThe concrete is poured within the formwork. dozer
IMG_2342.jpg
Dryed Structure42 viewsThe dried structure after the forms have been removed. dozer
IMG_2353.jpg
Tiling the Cabinet Interior41 viewsIn this case we used small white 4" tiles for the exterior and interior of the cabinets.dozer
IMG_2362.jpg
Tiled Insert40 viewsThis opening is designed to accomodate a Kitzcho brand shelving insert. dozer
IMG_2325.jpg
Outer Support39 viewsThe cabinet structure is made of red brick. The structure will support a U shaped counter. The outside frame will help support the weight of counter.dozer
IMG_2334.jpg
Rebar for Concrete39 viewsThe rebar is laid out for the concrete top pour. The poured sub counter will be used to support a granite counter top. dozer
17 files on 2 page(s) 1