happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2 > Roof

Most viewed - Roof
IMG_1995.jpg
Wood in Rafters83 viewsHard wood is fitted in the end of the rafters to be used as a surface to install the fascia board. dozer
IMG_1991.jpg
Gable Vent82 viewsThe gable vent is installed. dozer
IMG_2100.jpg
Batten Material Installed81 viewsThe prefab aluminum alloy batten pieces installed over the roof structure.dozer
IMG_2134.jpg
Angle Cutting Tiles81 viewsTiles are angle cut to fit into one of the the roof valleys . dozer
IMG_3418.jpg
Roof Overhang Too Much81 viewsThe roof overhang was too great allowing birds to enter in the area between the overhang and the fascia board.dozer
IMG_2110.jpg
Fixing Roof Level80 viewsAny areas of the roof that are 'slightly out of shape' as declared by the roofing engineer must be rectified by welding in a 1 by 1 inch riser to correct the level of the roof batten.dozer
IMG_1799.jpg
Starting the Roof79 viewsStarting to put up the roof structure. dozer
IMG_1826.jpg
Attic Walkway78 viewsThis allows for easier access to the attic area. Created from two parallel steel tubing beams with C section rib supports and 20mm grade A plywood as the walkway. dozer
IMG_3419.jpg
Roof Overhang Repair75 viewsThe conwood fascia is cut down to allow the roof tiles to be replaced with a tighter fit. dozer
IMG_1787.jpg
Dipping Beams68 viewsThis isn't the best way to paint the steel tubing, it uses too much paint (as it turns out) and unless the metal is extremely clean (as in wiped clean with thinner) the coverage is spotty. dozer
IMG_1783.jpg
Paint Track66 viewsA paint tray used to be able to dip the structural steel tubing into the primer paint.dozer
 
35 files on 3 page(s) 3

Debug Info 
Debug Output: show / hide