happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2 > Roof

Most viewed - Roof
IMG_1829.jpg
CPAC Roof Tile Engineer91 viewsThe tiling engineer from the company to do the roof tiling measuring and checking the roof structure so far. As they only lay down the tiles they must check that the roof structure is straight and able to hold the tile load. dozer
IMG_1989.jpg
Cutting the Rafters91 viewsA guide line is used to ensure the rafters are cut at the proper point. dozer
IMG_2175.jpg
Dry Tech at the Ridge Corner91 viewsThe final layer of dry tech material being laid in place at the ridge corner. dozer
IMG_1809.jpg
Corner Weld90 viewsA corner section sitting on a column. They do eventually touch up paint all of the welds in the structure.dozer
IMG_2865.jpg
Roof Interior90 viewsAn interior view of the roof. dozer
IMG_2173.jpg
Dry Teching the Ridge89 viewsThe first layer of dry tech material is fitted on an aluminum rail on the ridge line by the dry tech installer. dozer
IMG_2257pa.jpg
Bad Tile89 viewsA fairly innocuous looking ceramic tile, this one has a small fault (at the arrow) causing slight water leakage. The overall project had about 10 bad tiles and the slight water leakage could be easily spotted and repaired since no roof foil was used. dozer
IMG_2028.jpg
Gable Covering88 viewsThe thinner shera brand fascia covering was used for the gables. dozer
IMG_2107.jpg
Batten Material87 viewsA close up of the batten material used to hold the ceramic tiles in place.dozer
IMG_2108.jpg
Batten Close Up87 viewsThe roof battens are screwed into the roof structure using special roofing screws (threaded with head of screw formed as drill bit to enable the screws to penetrate the metal with no pilot hole necessary).dozer
IMG_1820.jpg
Walkway86 viewsTouching up paint and creating the attic walkway. dozer
IMG_2109.jpg
Fixing Roof Level85 viewsWelding in a small riser to correct the roof level. dozer
35 files on 3 page(s) 2