Most viewed - Plumbing |
Inbound Water Test60 viewsDuring the inbound water pressure test the only place one should see any moisture is at the lids if they haven't be glued in place. dozer
|
|
PVC Pipe Lids60 viewsAll PVC piping is covered to prevent concrete or other blockage from getting in it. Also the covers allow the inbound lines to be pressure tested. dozer
|
|
Cementing the Shower Floor60 viewsLaying concrete in the shower floor area. Notice the rebar mesh in the other shower floor area. dozer
|
|
Various PVC Pipes59 viewsShowing inbound water piping, a sink drain and vented toilet drain.dozer
|
|
Plan Bathroom + Kitchen Layout59 viewsThere are two bathrooms adjacent to each other. We continued the beam between the columns on the bathroom on the left for stability even though it is not shown in the plan.dozer
|
|
Setting Toilet Drain56 viewsSetting the toilet at the correct distance per the plan. dozer
|
|
Toilet Drain with Vent Opening55 viewsThe elbow has the all important vent opening which will be vented up through the roof and prevent sluggish toilet syndrome. dozer
|
|
Drain Water Test55 viewsThe other end of the drain pipe is capped and tested for all drain pipes prior to pouring of any concrete. dozer
|
|
Cutting Tool50 viewsThese cutting tools make it easy to get a nice cut on pvc. These are also required for cutting of the orange hot water flexi piping.dozer
|
|
Vent Pipe Wired46 viewsA 3/4" vent pipe wired in place. dozer
|
|
|
|
|
|
|
|