Construction Photos
Home > House Construction > Cool Thai House Phase 2 > Plumbing

Most viewed - Plumbing
IMG_1983.jpg
Wall Shot81 viewsThe walls are grooved for the vent pipes which will extend out through the roof. dozer
IMG_1506.jpg
Partially Dug Septic78 viewsThe seepage tanks here will be 1.2 m wide cement rounds with an exterior of stone aggregate. dozer
IMG_2263.jpg
Orange Flexi Tubing78 viewsThe orange flexi tubing works great for hot water plumbing. With the fittings at over 100 b and the per meter cost at about 100 b it is normally not selected or used in most projects except those with the owner directly buying the materials. dozer
DSCN0463.jpg
PVC Roof Venting78 viewsThe 3/4" PVC roof venting which vents the toilets, sinks and drain pipes. On top of this the septics are also vented, but venting the other appliances helps prevent vacuums and subsequently poor water flow. dozer
DSCN0504.jpg
Roof Vents74 viewsThese roof vents were custom made of stainless and fit through the special vent tiles.dozer
IMG_2006.jpg
Vent Pipe73 viewsThe 6 hun vent pipes to be extended up and routed through the specialty roof tiles which have an opening and plastic sleeve. dozer
IMG_1513.jpg
Leveling the Toilet Pipe72 viewsAny of the piping which doesn't come up vertical straight causes problems with fittings and attachments. The pvc is leveled and will be secured in place prior to the pour of concrete.dozer
IMG_2519.jpg
Plumbing Help??71 viewsHelped install the pump and fixtures in the house but unfortunately messed up a pump washer and bolt which took 6 weeks to get a replacement from Mitsubishi. dozer
IMG_1516.jpg
1 and 1/2 bathrooms69 viewsThe view of the beam setup for 1 and 1/2 bathrooms. dozer
IMG_1729.jpg
Rough Plumbing Layout69 viewsAll of the inbound water pipes (1/2") and drain pipes ready for water pressure test. dozer
IMG_1879.jpg
Bathroom Layout69 viewsBathroom nearing readiness to have the floors poured. The main floor will be poured first and then later the shower floors will be poured as they are at a lower level. dozer
IMG_1693.jpg
Setting Up the Pump67 viewsBefore getting too far the pump needs to be set up for so the inbound lines can be pressure tested. Any problems can be checked/fixed before concrete is poured over any piping. dozer