happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2 > Structure

Most viewed - Structure
IMG_2190.jpg
Brooming the Wall90 viewsThe brooming is used as the final step to get the finish on the wall.dozer
IMG_1795.jpg
Water Level Established89 viewsLevel lines are established using the clear tubing. The lines are used during the build to establish the top most level of the columns and for the floor. dozer
IMG_2199.jpg
Column Edging89 viewsThe columns are edged showing their outline, here pictured in a wall that has been rendered but yet to be painted.dozer
IMG_2191.jpg
Rendering with Sponge88 viewsA sponge is used to get the final finish on the wall.dozer
IMG_1721.jpg
Spacers applied to Edge of Rebar Frame86 viewsThe spacers were used to keep the rebar from coming too close to the edges of the forms. dozer
IMG_1860.jpg
Metal Spacer86 viewsA metal spacer is in place to set the position of the rebar during the walkway pour. It is good to use spacers in confined areas like this one which will not need to be walked on.dozer
IMG_1873.jpg
Walkway on Top of Septic86 viewsHere the walkway is being poured behind the house. dozer
IMG_1899.jpg
Lanko 70186 viewsThis is a high compressive strength non shrink grout which was used to top up any columns that were poured to an incorrect height.dozer
IMG_1258.jpg
Nylon String for Column Layout80 viewsA nice heavy nylon string to be used in setting up the site layout (location of each column) which works better than the invisible fishing line commonly used. dozer
     
69 files on 6 page(s) 6

Debug Info 
Debug Output: show / hide