Footing HoleThe footings are dug out 1 m. square by up to 40 cm. deep depending on the slope of the land. As the ground beam will sit right on the footing, the footings are poured so that they are level.dozerSep 27, 2011
IMG_3071.JPG
Footing frame baseThe framework base for the footings made out of 6 mm rebar.
dozerSep 27, 2011
IMG_3074.JPG
Footing holeThe footing hole and base framework on a poured concrete lip.
dozerSep 27, 2011
IMG_3076.JPG
Footing holeThe footing hole with rebar framework.
dozerSep 27, 2011
IMG_3083.JPG
Form work for ground beamThe wood form work to support the pour of the ground beam which sits on the footing. The ground beam will be 10 centimeters wide by about 20 centimeters deep.
dozerSep 27, 2011
IMG_3086.JPG
Ground BeamPour in progress.
dozerSep 27, 2011
IMG_3087.JPG
Ground BeamAfter a completed pour with the metal frames distributed evenly at 2.5 meter intervals.
dozerSep 27, 2011
IMG_3094.JPG
Staggered Ground BeamA staggered ground beam design to accommodate for unevenness in the ground level.
dozerSep 27, 2011