happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2

Last additions - Cool Thai House Phase 2
IMG_2549.jpg
Working on Metal CabinetThe metal cabinet in the process of being welded - not sure what the hammer is for. dozerSep 27, 2011
IMG_2535.jpg
CabinetOne cabinet at the beginning. We had him do several of these, used for storage. dozerSep 27, 2011
IMG_2443.jpg
SpacerA spacer tool to ensure the vertical metal bars are straight. dozerSep 27, 2011
IMG_2317.jpg
Barbed Wire SupportThis shows a support for barbed wire which utilizes tensioners that fit into the support. dozerSep 27, 2011
IMG_2274.jpg
Satillite StandThis is the satellite stand used to support the 6' dish. dozerSep 27, 2011
IMG_2247.jpg
Partially Welded LadderA partially welded ladder that will be anchor bolt mounted on the wall to allow attic access through the service entry. dozerSep 27, 2011
DSCN0382.jpg
BedA single bed as fabricated by the welder. The side rails can be unbolted and it can be disassembled as required. dozerSep 27, 2011
DSCN0380.jpg
Service LadderThe service ladder as mounted to the wall. dozerSep 27, 2011
DSCN0377.jpg
Bunk BedThis bunk bed was created from a small picture given to the welder by Ms Dozer. The pieces bolt together and it was a great use of some excess steel we had lying around. dozerSep 27, 2011
DSCN0375.jpg
Satillite TowerThe completed satellite tower with the dish on top.dozerSep 27, 2011
DSCN0371.jpg
Gate LatchI had given the welder some ideas for the gate latch in that I wanted something that didn't lock and could be opened and closed easily with one hand. He came up with this him self using extra lengths of the security metal. dozerSep 27, 2011
DSCN0369.jpg
Security MetalThe hand fabricated security metal. This was made from prefab pieces of metal. He welded them in sections and then installed them on top of the wall. dozerSep 27, 2011
437 files on 37 page(s) 8

Debug Info 
Debug Output: show / hide