DSC03533.jpg
Installing the Outer CasingThe outer casing is just a shell to hide the inner workings of the roll up door. The door rolls up into this casing. This is located on the upper inside. dozerSep 27, 2011
DSC03531.jpg
Finished CasingThe finished mechanism casing. The covering panels are riveted into place.dozerSep 27, 2011
DSCN0472.jpg
Bunk Bed Bolt AttachmentsThe brackets which allow the bunk bed to be assembled/disassembled with bolts. dozerSep 27, 2011
IMG_2451~0.jpg
Security MetalThe welder used guides to ensure the spacing between the vertical bars was consistent. The long 1 by 1 is used as a horizontal guide. The work turned out very straight. dozerSep 27, 2011
Photo-0023.jpg
HeadboardPainting a head board just welded with the foot board visible behind it. dozerSep 27, 2011
IMG_2928.jpg
Shelving for StorageOK, not actually anything welded, but they did cut, assemble and put together several sets of shelving. dozerSep 27, 2011
IMG_2918.jpg
Metal Roof on Storage ShedThis metal roof was welded on this storage shed after the old corrugated roofing became problematic. dozerSep 27, 2011
IMG_2853.jpg
Storage CabinetsWelded together several of these storage cabinets with the exterior being metal mesh. The design using mesh allows stuff to be hung on from the mesh with U hooks. dozerSep 27, 2011
IMG_2846.jpg
Storage CabinetThe frame of the cabinet prior to attaching the wood shelving and latches. dozerSep 27, 2011
IMG_2810.jpg
Working on a GateFabricating one panel for a gate. dozerSep 27, 2011
IMG_2597~0.jpg
Security MetalWelding security metal in place. dozerSep 27, 2011
IMG_2593.jpg
Coming up with Curved PieceThe curved pieces of security metal are purchased already curved. Here the welder is curving a piece (from a straight one) since we had run out of the curved ones.dozerSep 27, 2011