|

Last additions - Cool Thai House Phase 2 |

Recessed LightInstalling one recessed lighting fixture. dozerSep 26, 2011
|
|

Main Circuit BoxThe eventual location where the main circuit box will go. dozerSep 26, 2011
|
|

Routing ConduitRunning conduit to its appropriate location. Notice that long lengths are wired to the roof structure to prevent sagging. dozerSep 26, 2011
|
|

Neat Conduit LayoutConduit positioned in preparation for the recessed lighting and other ceiling electrics.dozerSep 26, 2011
|
|

Junction BoxesThe PVC plastic junction boxes are set in place which the screw type connectors. dozerSep 26, 2011
|
|

Electric Running to Main CircuitWhere the main electric control box will be. dozerSep 26, 2011
|
|

Underground Electric ConduitThe underground electric conduit as it runs in a trench. dozerSep 26, 2011
|
|

Kitchen ElectricElectrics for kitchen lighting above and below the cabinets along with a switch box and two receptacle boxes. dozerSep 26, 2011
|
|

Kitchen ElectricThis is a switch and receptacle box that will go above the kitchen counter.dozerSep 26, 2011
|
|

Junction Box in WallA sunken junction box with a screw type connector. dozerSep 26, 2011
|
|

Control RoomThe control room for the CCTV system and LAN. Each box accommodates 3 RG6 cables and there are boxes for the CAT5 internet cable plus electric. dozerSep 26, 2011
|
|

Destination for the Main PanelThe main electric control panel will be fitted above these lengths of electric conduit.dozerSep 26, 2011
|
|
437 files on 37 page(s) |
 |
 |
 |
 |
 |
29 |  |
 |
 |
 |
|

|
|
|