happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2

Last additions - Cool Thai House Phase 2
IMG_2466.jpg
Recessed LightInstalling one recessed lighting fixture. dozerSep 26, 2011
IMG_2261.jpg
Main Circuit BoxThe eventual location where the main circuit box will go. dozerSep 26, 2011
IMG_2259.jpg
Routing ConduitRunning conduit to its appropriate location. Notice that long lengths are wired to the roof structure to prevent sagging. dozerSep 26, 2011
IMG_2244.jpg
Neat Conduit LayoutConduit positioned in preparation for the recessed lighting and other ceiling electrics.dozerSep 26, 2011
IMG_2224.jpg
Junction BoxesThe PVC plastic junction boxes are set in place which the screw type connectors. dozerSep 26, 2011
IMG_2223.jpg
Electric Running to Main CircuitWhere the main electric control box will be. dozerSep 26, 2011
IMG_2157.jpg
Underground Electric ConduitThe underground electric conduit as it runs in a trench. dozerSep 26, 2011
IMG_2051.jpg
Kitchen ElectricElectrics for kitchen lighting above and below the cabinets along with a switch box and two receptacle boxes. dozerSep 26, 2011
IMG_2018.jpg
Kitchen ElectricThis is a switch and receptacle box that will go above the kitchen counter.dozerSep 26, 2011
IMG_2014.jpg
Junction Box in WallA sunken junction box with a screw type connector. dozerSep 26, 2011
IMG_2012.jpg
Control RoomThe control room for the CCTV system and LAN. Each box accommodates 3 RG6 cables and there are boxes for the CAT5 internet cable plus electric. dozerSep 26, 2011
IMG_1837.jpg
Destination for the Main PanelThe main electric control panel will be fitted above these lengths of electric conduit.dozerSep 26, 2011
437 files on 37 page(s) 29

Debug Info 
Debug Output: show / hide