Last additions - Cool Thai House Phase 2
IMG_3514.jpg
Concrete Hole Drill BitThe A/C guy had a nice drill bit to drill through concrete or aerated block. Much nicer than the hammer and chisel approach. dozerSep 26, 2011
IMG_3485.jpg
Short One SwitchWe decided later we needed one additional eves light. There is a remote switch for the box so no hard wired switch is needed. dozerSep 26, 2011
IMG_3478.jpg
Remote SwitchThe remote switch for the one extra exterior light that we wired in after the fact. dozerSep 26, 2011
IMG_2863.jpg
Attic Light SwitchAttic fitted with florescent lighting and surface mounted switch box. dozerSep 26, 2011
IMG_2862.jpg
Junction BoxesVarious junction boxes and conduit routing in the attic. Notice that conduit is wired in place so it does not lay on the drywall ceiling. dozerSep 26, 2011
IMG_2861.jpg
Recessed Light FixtureA recessed light fixture with wire nut tapeless connections.dozerSep 26, 2011
IMG_2794.jpg
Water Tank Electric SwitchAn electric solenoid floater type switch allows the switch to be configured to only turn on once the desired level as been reached. dozerSep 26, 2011
IMG_2771.jpg
Main Circuit Box; BticinoThe Bticino circuit box with different size breakers for different electrical components throughout the house. dozerSep 26, 2011
IMG_2766.jpg
Working on Circuit Box InstallationThe electrician installing the circuit box.dozerSep 26, 2011
IMG_2559.jpg
Floor ElectricThe openings for the floor electric in the study. dozerSep 26, 2011
IMG_2507.jpg
Configuring the Floor ElectricLaying out the location of the floor electric pop up electric boxes which will be in the study area of the house. dozerSep 26, 2011
IMG_2497.jpg
Flexi ConduitThis white conduit comes is nice for running wires to recessed lighting. dozerSep 26, 2011