Batten MaterialA close up of the batten material used to hold the ceramic tiles in place.dozerSep 26, 2011
IMG_2100.jpg
Batten Material InstalledThe prefab aluminum alloy batten pieces installed over the roof structure.dozerSep 26, 2011
IMG_2028.jpg
Gable CoveringThe thinner shera brand fascia covering was used for the gables. dozerSep 26, 2011
IMG_2026.jpg
Double Box SectionsThe exterior of the roof structure was done with double box sections of 3.2mm 2x4.dozerSep 26, 2011
IMG_2020.jpg
FasciaThis project used the heavier conwood (6" and 8") as fascia. This seems to work better than the thinner Shera fascia as the conwood doesn't warp over time.dozerSep 26, 2011
IMG_1995.jpg
Wood in RaftersHard wood is fitted in the end of the rafters to be used as a surface to install the fascia board. dozerSep 26, 2011
IMG_1991.jpg
Gable VentThe gable vent is installed. dozerSep 26, 2011
IMG_1989.jpg
Cutting the RaftersA guide line is used to ensure the rafters are cut at the proper point. dozerSep 26, 2011
IMG_1905.jpg
Post to be Topped OffThis short post will be topped off with lanko 701 grout so the metal roof structure is sitting on concrete.dozerSep 26, 2011
IMG_1829.jpg
CPAC Roof Tile EngineerThe tiling engineer from the company to do the roof tiling measuring and checking the roof structure so far. As they only lay down the tiles they must check that the roof structure is straight and able to hold the tile load. dozerSep 26, 2011
IMG_1826.jpg
Attic WalkwayThis allows for easier access to the attic area. Created from two parallel steel tubing beams with C section rib supports and 20mm grade A plywood as the walkway. dozerSep 26, 2011
IMG_1820.jpg
WalkwayTouching up paint and creating the attic walkway. dozerSep 26, 2011