Home > House Construction > Cool Thai House Phase 2

Last additions - Cool Thai House Phase 2
IMG_2175.jpg
Dry Tech at the Ridge CornerThe final layer of dry tech material being laid in place at the ridge corner. dozerSep 27, 2011
IMG_2174.jpg
Dry Tech at the RidgeThe dry tech along the ridge. There are two levels of material which sit on an aluminum rail. dozerSep 27, 2011
IMG_2173.jpg
Dry Teching the RidgeThe first layer of dry tech material is fitted on an aluminum rail on the ridge line by the dry tech installer. dozerSep 27, 2011
IMG_2169.jpg
Dry TechThe two layers of dry tech materials being set in place by the installer. dozerSep 27, 2011
IMG_2135.jpg
Prefab Valley MaterialThis is the chang prefabricated valley material as installed in a roof valley (shown from the inside). dozerSep 27, 2011
IMG_2134.jpg
Angle Cutting TilesTiles are angle cut to fit into one of the the roof valleys . dozerSep 26, 2011
IMG_2132.jpg
Lifting Tiles into PlaceThe tile guys are lifting the tiles into place and setting them on the battens. dozerSep 26, 2011
IMG_2121.jpg
Plastic SheetingPlastic sheeting is laid down no top of the 20 mm plywood walkway to protect it from rain.dozerSep 26, 2011
IMG_2116.jpg
Interior of Roof StructureA shot of the interior of the roof structure with the tile battens in place.dozerSep 26, 2011
IMG_2110.jpg
Fixing Roof LevelAny areas of the roof that are 'slightly out of shape' as declared by the roofing engineer must be rectified by welding in a 1 by 1 inch riser to correct the level of the roof batten.dozerSep 26, 2011
IMG_2109.jpg
Fixing Roof LevelWelding in a small riser to correct the roof level. dozerSep 26, 2011
IMG_2108.jpg
Batten Close UpThe roof battens are screwed into the roof structure using special roofing screws (threaded with head of screw formed as drill bit to enable the screws to penetrate the metal with no pilot hole necessary).dozerSep 26, 2011