|
![](images/spacer.gif)
Last additions - Cool Thai House Phase 2 |
![Filename=IMG_2543.jpg
Filesize=296KiB
Dimensions=1280x960
Date added=Sep 27, 2011 IMG_2543.jpg](albums/userpics/10002/thumb_IMG_2543.jpg)
Affixing ScreenAffixing a piece of metal screen to the aluminum ceiling frame. dozerSep 27, 2011
|
|
![Filename=IMG_2542.jpg
Filesize=308KiB
Dimensions=1280x960
Date added=Sep 27, 2011 IMG_2542.jpg](albums/userpics/10002/thumb_IMG_2542.jpg)
Cutting Smart BoardThe smart board comes in sheets and is cut to size as needed. dozerSep 27, 2011
|
|
![Filename=IMG_2530.jpg
Filesize=425KiB
Dimensions=1280x960
Date added=Sep 27, 2011 IMG_2530.jpg](albums/userpics/10002/thumb_IMG_2530.jpg)
Aluminum Rail FrameworkInstalling the rail framework. The rails are run to form sections to support the smart board ceiling sections. The suspended framework is supported by aluminum strips affixed to the roof structure. dozerSep 27, 2011
|
|
![Filename=IMG_2511.jpg
Filesize=254KiB
Dimensions=960x1280
Date added=Sep 27, 2011 IMG_2511.jpg](albums/userpics/10002/thumb_IMG_2511.jpg)
Exterior Ceiling FrameInstalling the horizontal members of the aluminum frame on the exterior of the house. dozerSep 27, 2011
|
|
![Filename=IMG_2510.jpg
Filesize=356KiB
Dimensions=1280x960
Date added=Sep 27, 2011 IMG_2510.jpg](albums/userpics/10002/thumb_IMG_2510.jpg)
Setting in the Cross SupportsSetting the cross supports into place for the exterior ceiling.dozerSep 27, 2011
|
|
![Filename=IMG_2401.jpg
Filesize=193KiB
Dimensions=1280x960
Date added=Sep 27, 2011 IMG_2401.jpg](albums/userpics/10002/thumb_IMG_2401.jpg)
Taping a JointTaping a joint on the interior ceiling. The joints are taped, plastered and sanded for a smooth finish. dozerSep 27, 2011
|
|
![Filename=IMG_2400.jpg
Filesize=189KiB
Dimensions=1280x960
Date added=Sep 27, 2011 IMG_2400.jpg](albums/userpics/10002/thumb_IMG_2400.jpg)
Plastering after TapeThe taped joints are plastered and then later sanded. The screw heads are plastered as seen with the white spots. dozerSep 27, 2011
|
|
![Filename=IMG_2398.jpg
Filesize=307KiB
Dimensions=1280x960
Date added=Sep 27, 2011 IMG_2398.jpg](albums/userpics/10002/thumb_IMG_2398.jpg)
Service EntryThe prefab service entries (Chang Brand) are more expensive than just doing one up out of spare drywall sheeting but they are more durable and after using them prefer them to just the home made versions. They are two pieces, frame and opening and come in various sizes, this one the openings are 60 x 60.dozerSep 27, 2011
|
|
![Filename=IMG_2391.jpg
Filesize=176KiB
Dimensions=1280x960
Date added=Sep 27, 2011 IMG_2391.jpg](albums/userpics/10002/thumb_IMG_2391.jpg)
Ceiling after PlasterThe interior ceiling after taping and plastering prior to finishing sanding. dozerSep 27, 2011
|
|
![Filename=IMG_2389.jpg
Filesize=200KiB
Dimensions=1280x960
Date added=Sep 27, 2011 IMG_2389.jpg](albums/userpics/10002/thumb_IMG_2389.jpg)
Installing Service EntryInstalling the service entry. BTW it wasn't the installer that recommended these, think they are seldom used but they certainly are worth the few extra baht. dozerSep 27, 2011
|
|
![Filename=IMG_2375.jpg
Filesize=405KiB
Dimensions=1280x960
Date added=Sep 27, 2011 IMG_2375.jpg](albums/userpics/10002/thumb_IMG_2375.jpg)
Drywall Piece InstallationA piece of drywall sheeting is installed. We used Chang brand and water resistant in the bathrooms. dozerSep 27, 2011
|
|
![Filename=IMG_2368.jpg
Filesize=161KiB
Dimensions=1280x960
Date added=Sep 27, 2011 IMG_2368.jpg](albums/userpics/10002/thumb_IMG_2368.jpg)
Drywall SheetingA room after the sheeting is affixed to the frame work, prior to taping, plastering and sanding. This particular room doesn't have a step. dozerSep 27, 2011
|
|
437 files on 37 page(s) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
20 | ![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
|
![](images/spacer.gif)
|
|
|