|

Last additions - Cool Thai House Phase 2 |

Rebar for ConcreteThe rebar is laid out for the concrete top pour. The poured sub counter will be used to support a granite counter top. dozerSep 27, 2011
|
|

Cabinet WallsThe supporting walls for the counter are placed according to the design of where the lower doors will go. dozerSep 27, 2011
|
|

Outer SupportThe cabinet structure is made of red brick. The structure will support a U shaped counter. The outside frame will help support the weight of counter.dozerSep 27, 2011
|
|

Tile WashingThe tiles are always prepared by immersion in fresh water prior to being laid. dozerSep 27, 2011
|
|

Finished Granito TilesA finished section of granito floor tiles.dozerSep 27, 2011
|
|

Finished Bathroom SectionA finished section of the bathroom wall tiles.dozerSep 27, 2011
|
|

Kitchen Trim TransitionThe kitchen wall tiles transition to the wood trim. dozerSep 27, 2011
|
|

Glass TilesThe glass tiles under the installed cabinets.dozerSep 27, 2011
|
|

Aluminum TrimOn the driveway we used aluminum trim edging.dozerSep 27, 2011
|
|

Bezen Tiles PatioThe patio tiles have held up well so far. dozerSep 27, 2011
|
|

Bezen Tiles DrivewayThe driveway tiles.dozerSep 27, 2011
|
|

Tile Spacer GuideA tile is used as a spacer guide to ensure the proper distance between tiles.dozerSep 27, 2011
|
|
437 files on 37 page(s) |
 |
 |
 |
 |
 |
16 |  |
 |
 |
 |
|

|
|
|