Last additions - Cool Thai House Phase 2
IMG_2791.jpg
Hardware to Support Upper CabinetsThe wall mounting to support the upper cabinets. The electric is for above and below florescent lighting.dozerSep 27, 2011
IMG_2393.jpg
Shelving UnitThis opening is designed for another shelving unit (Kitchzo). dozerSep 27, 2011
IMG_2381.jpg
Tiling CompleteThe tiling and grouting of the cabinets are complete. dozerSep 27, 2011
IMG_2376.jpg
Tiling on the InsideTiling on the inside of the cabinets.dozerSep 27, 2011
IMG_2363.jpg
Tiled Table LegThe tiled and edged table leg prior to it being grouted.dozerSep 27, 2011
IMG_2362.jpg
Tiled InsertThis opening is designed to accomodate a Kitzcho brand shelving insert. dozerSep 27, 2011
IMG_2353.jpg
Tiling the Cabinet InteriorIn this case we used small white 4" tiles for the exterior and interior of the cabinets.dozerSep 27, 2011
IMG_2342.jpg
Dryed StructureThe dried structure after the forms have been removed. dozerSep 27, 2011
IMG_2341.jpg
Edged CornersThe corners of the cabinet and table top are edged and squared. dozerSep 27, 2011
IMG_2339.jpg
Opening for Stove TopAn opening for the stovetop within the poured counter. dozerSep 27, 2011
IMG_2338.jpg
Poured ConcreteThe concrete is poured within the formwork. dozerSep 27, 2011
IMG_2336.jpg
Formwork for Sink and StoveThe areas formed off are for the stove top and sink as they will not be poured. dozerSep 27, 2011