Door HingeAttaching the door hinges to a sold wood door. 4 hinges are used to prevent any sagging. dozerSep 27, 2011
|
|

Aluminum Window FrameAttaching the aluminum window frame to the sill. dozerSep 27, 2011
|
|

Squaring Window OpeningThe window installer shapes the opening if it is not exactly square. dozerSep 27, 2011
|
|

Door FrameingThe door frame is secured in place. Column supports are poured on the side of each door frame. dozerSep 27, 2011
|
|

Glass BlocksGlass blocks laid above a ring beam with spacers in place. dozerSep 27, 2011
|
|

LintelThe form work for a lintel above a door opening. dozerSep 27, 2011
|
|

Side BeamU shaped pieces of rebar are used to keep the form work from bulging during the pour of the side column support for the door.dozerSep 27, 2011
|
|

FormworkAnother view of the form work in place to secure the door frame to the adjacent walls. dozerSep 27, 2011
|
|

Prepping Door FrameNails are used on the exterior of the frame. Rebar extends out of the aerated block. A vertical beam will be poured on either side of the door.dozerSep 27, 2011
|
|

Nail PreppingNails on the frame as well as a 9mm piece of rebar which will be in the vertical beam. dozerSep 27, 2011
|
|

Installing Shelving UnitThe shelving units are installed with anchor bolts to the inside of the concrete structure. dozerSep 27, 2011
|
|

Mounting the Upper CabinetsStarting to Mount the Upper CabinetsdozerSep 27, 2011
|
|