Construction Photos
Home > House Construction > Cool Thai House Phase 2

Last additions - Cool Thai House Phase 2
IMG_2122.jpg
Affixing Side BeamThe side metal beams were affixed to the wall with anchor bolts. dozerSep 27, 2011
IMG_2118.jpg
Metal Divider on FloorThe finished tiles will be above the seam making a slight step into the room. The beam is anchor bolted to the floor. dozerSep 27, 2011
IMG_2112.jpg
Top MeshThe top mesh is used to prevent access via the roof, the metal bars are just welded one on top of another (this area will be above the ceiling not will not be seen). dozerSep 27, 2011
IMG_2075.jpg
Working on Top MeshThe top metal mesh work is additionally welded to the roof structure for support. dozerSep 27, 2011
IMG_1963.jpg
Walls ReinforcedThe walls are reinforced with 6mm rebar meshing. Here the rebar is anchored in the ring beam. dozerSep 27, 2011
IMG_1950.jpg
Double WallThe double wall has a layer of poured re enforced concrete in the middle. dozerSep 27, 2011
DSCN0505.jpg
Sliding Aluminum WindowThere are three tracks, one for the screen (inside) and two for the window sections. dozerSep 27, 2011
DSCN0474.jpg
Shower EnclosureThe shower enclosure glass and handle. The glass is 10 mm safety glass with stainless handles and fittings done by the aluminum window factory. dozerSep 27, 2011
IMG_3541.jpg
Side Door FitThe doors fit nicely in the frames.dozerSep 27, 2011
IMG_3540.jpg
Adjusting the OpeningHere the door opening is being adjusted. dozerSep 27, 2011
IMG_2759.jpg
Door PaintingOil based paint (TOA Glipton) applied to louvered solid hardwood bathroom door. dozerSep 27, 2011
IMG_2705.jpg
Window FrameA view of the window frame. There are two tracks, one for the screen and one for the window.dozerSep 27, 2011