Last additions - Cool Thai House Phase 2 |

Decorative Standstone CarvingsThe small decorative sandstone 30 cm tiles (each under 200 baht) were placed in various locations on the wall. dozerSep 27, 2011
|
|

Affixing Sandtone TilesThe sandstone tiles are fitted up near the wood trim. dozerSep 27, 2011
|
|

Rendered SurfaceThe rendered surface with a pencil line where the sandstone engraving will be placed. The surface was rendered by the tiler to ensure true surfaces.dozerSep 27, 2011
|
|

Lower StepThe lower step and transition to tile. One length of steel tubing is above ground and one is half under the tile level.dozerSep 27, 2011
|
|

Upper TransitionThe upper length of structural steel tubing is used as a transition into the ceiling. dozerSep 27, 2011
|
|

Finished Secured Metal PartitionThe completed metal partition with door. dozerSep 27, 2011
|
|

Rear WindowThe secured rear opening. dozerSep 27, 2011
|
|

Attaching the Guide BarAttaching the guide bar to be used in fitting in the last row of cross members. dozerSep 27, 2011
|
|

Guide BarDuring the welding process a guide bar was used so that the cross members would be welding into place straight. dozerSep 27, 2011
|
|

Partial DoorThe beginning of the door and lower panel. dozerSep 27, 2011
|
|

Guide LinesEstablishing a guide line for the cross supports. dozerSep 27, 2011
|
|

Welding Lower BeamWelding the lower beam in place. dozerSep 27, 2011
|
|
437 files on 37 page(s) |
 |
 |
 |
 |
 |