happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2

Last additions - Cool Thai House Phase 2
DSCN0342_edited-1.jpg
The other Wall dozerSep 27, 2011
DSCN0341.jpg
Finish at Wood TrimThe tiler did a nice job finishing off the upper tile row next to the wood trim.dozerSep 27, 2011
DSCN0340.jpg
Finish at adjacent WallThe corner was just painted to blend from the untiled wall to the tiled wall.dozerSep 27, 2011
IMG_2783.jpg
Nearing CompletionThe engraving in place and most of the tiling complete. Notice the randomly placed square sandstone tiles and the finish where the tiles meet the wood trim. dozerSep 27, 2011
IMG_2767.jpg
Partially Finished WallThe wall with the engraving in place and the lower portion of the sandstone tiling complete.dozerSep 27, 2011
IMG_2760.jpg
Lifting Mural into PlaceLifting the engraving into place. dozerSep 27, 2011
IMG_2755.jpg
Prep Back of MuralThe adhesive is applied to the back of the engraving. dozerSep 27, 2011
IMG_2752.jpg
Weber Tile AdhesiveThe weber tile adhesive is applied to prep the surface for the engraving.dozerSep 27, 2011
IMG_2748.jpg
Lower Section TiledPreparing for placing the mural, the lower section has been tiled and next the sandstone engraving will be lifted into place.dozerSep 27, 2011
IMG_2743.jpg
Engraving FrameThe prepared frame for where the 75 kg. engraving will be placed.dozerSep 27, 2011
IMG_2741.jpg
Preparing Engraving FrameThe wall was indented in order to have a frame to support the large sandstone engraving. dozerSep 27, 2011
IMG_2740.jpg
Large Melann Sandstone EngravingThese come in either 1 pc (as this one) or 3 pcs. We chose the single piece which weighs 75kg. dozerSep 27, 2011
437 files on 37 page(s) 11

Debug Info 
Debug Output: show / hide