happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2

Last additions - Cool Thai House Phase 2
IMG_2505.jpg
Faucet Hole DrillingWater is applied to keep the bit from getting too hot. dozerSep 27, 2011
IMG_2495.jpg
Final Adjustment Stove Top AreaFinal adjustment on the area where the stove top will fit in. dozerSep 27, 2011
IMG_2494.jpg
Sink OpeningThe sink opening for an undermount sink is always cut at the factory, the stove opening will be cut on-site.dozerSep 27, 2011
IMG_2492.jpg
Granite Top SetTwo of the granite top pieces are set in place to check the fit. The stove top opening will be cut on-site. dozerSep 27, 2011
IMG_2491.jpg
Final CracksAny slight openings are grouted by the installers.dozerSep 27, 2011
IMG_2490.jpg
Concrete SlurryThe mix used to concrete the granite counter top to the base.dozerSep 27, 2011
IMG_2489.jpg
Setting Bathroom Top in PlaceSetting the bathroom granite into place. dozerSep 27, 2011
IMG_2751.jpg
Corner FinishShows a thick wall with a door frame being cornered with the small sandstone tiles. Notice the guide line in the corner and that the small tiles are cut at a 45 degree angle to make the corner transition. dozerSep 27, 2011
DSCN0349.jpg
Small Square Sandstone TileThese small square tiles added a nice flair to the overall wall and aren't expensive either (under 200 b each).dozerSep 27, 2011
DSCN0348.jpg
Large Sandstone EngravingThese engravings come in various shapes and sizes, this one weighing 75kg brand name Melann (at the time 3 pc cost was 7500, one piece was 9500b). dozerSep 27, 2011
DSCN0345.jpg
Finished SandstoneThe small sandstone tiles mixed in the the 30 cm square tiles for effect.dozerSep 27, 2011
DSCN0343.jpg
Completed WallThe completed wall with large sandstone engraving and small sandstone feature tiles.dozerSep 27, 2011
437 files on 37 page(s) 10

Debug Info 
Debug Output: show / hide