|

Last additions - Cool Thai House Phase 2 |

Faucet Hole DrillingWater is applied to keep the bit from getting too hot. dozerSep 27, 2011
|
|

Final Adjustment Stove Top AreaFinal adjustment on the area where the stove top will fit in. dozerSep 27, 2011
|
|

Sink OpeningThe sink opening for an undermount sink is always cut at the factory, the stove opening will be cut on-site.dozerSep 27, 2011
|
|

Granite Top SetTwo of the granite top pieces are set in place to check the fit. The stove top opening will be cut on-site. dozerSep 27, 2011
|
|

Final CracksAny slight openings are grouted by the installers.dozerSep 27, 2011
|
|

Concrete SlurryThe mix used to concrete the granite counter top to the base.dozerSep 27, 2011
|
|

Setting Bathroom Top in PlaceSetting the bathroom granite into place. dozerSep 27, 2011
|
|

Corner FinishShows a thick wall with a door frame being cornered with the small sandstone tiles. Notice the guide line in the corner and that the small tiles are cut at a 45 degree angle to make the corner transition. dozerSep 27, 2011
|
|

Small Square Sandstone TileThese small square tiles added a nice flair to the overall wall and aren't expensive either (under 200 b each).dozerSep 27, 2011
|
|

Large Sandstone EngravingThese engravings come in various shapes and sizes, this one weighing 75kg brand name Melann (at the time 3 pc cost was 7500, one piece was 9500b). dozerSep 27, 2011
|
|

Finished SandstoneThe small sandstone tiles mixed in the the 30 cm square tiles for effect.dozerSep 27, 2011
|
|

Completed WallThe completed wall with large sandstone engraving and small sandstone feature tiles.dozerSep 27, 2011
|
|
437 files on 37 page(s) |
 |
 |
 |
 |
 |
10 |  |
 |
 |
 |
|

|
|
|