happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2

Last additions - Cool Thai House Phase 2
CTHP2FinishedView.youtube
Video WalkthroughA quick video walk though of the project a while after completion. dozerSep 27, 2011
DSCN0415.jpg
Side Walkway and GardenThe 2m wide side walkway and garden area with 3 small tower type garden lights.dozerSep 27, 2011
IMG_0164.jpg
StudySmall sandstone tiles are used on the wall area of the study.dozerSep 27, 2011
DSCN0493.jpg
Storage Unit InsideAnother view of the storage/utility room with metal racks currently used for storage. dozerSep 27, 2011
DSCN0492.jpg
Ladder and AccessThe service entry access is on the ceiling with the wall mounted ladder providing access. The glass blocks are the oversized 30 cm x 30 cm variety. dozerSep 27, 2011
DSCN0491.jpg
Secured StorageThe security partition to make a secured storage area. The partition is made of 1 by 1 lengths of metal welded into a mesh pattern.dozerSep 27, 2011
DSCN0490.jpg
Secured StorageA utility/secured storage room with a bunk bed in it. The roll up doors in this unit are split with a small and large section. dozerSep 27, 2011
DSCN0489.jpg
Bathroom #2There is a small granite sink unit in each bathroom. The sink is an under mount type.dozerSep 27, 2011
DSCN0488.jpg
Bathroom #2Shower enclosure the same as in bathroom number 1. dozerSep 27, 2011
DSCN0487.jpg
BedroomThe other side of the bedroom with the bathroom off to the right. The ceilings are stepped/trimmed in this room.dozerSep 27, 2011
DSCN0486.jpg
BedroomThe bedroom window view. The room is appx 6 m long by 4 m wide. dozerSep 27, 2011
DSCN0484.jpg
Bathroom #1The bathroom off the study area. The enclosure is 10mm glass / stainless custom made for around 15k from the same guy that did the aluminum windows.dozerSep 27, 2011
437 files on 37 page(s) 1

Debug Info 
Debug Output: show / hide