|
Last additions - House Construction |
Deep Water Pump AssemblyPreparing the Franklin deep water pump to be submerged. dozerSep 26, 2011
|
|
A Melted PVC JointThe PVC joints for the piping that brings the water up from the pump are melted into place. dozerSep 26, 2011
|
|
Gas Melting StationHere is the rig they used to melt the PVC piping in place. dozerSep 26, 2011
|
|
Franklin PumpA view of the pump without the exterior housing. dozerSep 26, 2011
|
|
Drill Rig Set UpThe rig used to drill the hole with the shaft harness upright and in position. dozerSep 26, 2011
|
|
Drill Rig with Drilling ShaftsThe drilling rig. The shafts in the foreground are for drilling and attach to the trucks drill harness. dozerSep 26, 2011
|
|
Well Rig Gets to LandJust enough clearance to get into the land. This is a utility gate not used as a regular entrance, as it allows entry from someone else's land (currently unoccupied). Was slated for removal, glad we kept it.dozerSep 26, 2011
|
|
|
943 files on 79 page(s) |
|
|
|
|
|
|
|
|
|
79 |
|
|
|
|