happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction

Last additions - House Construction
IMG_1275.jpg
LayoutA piece of nylon string and 3mm rebar indicating the middle of a particular column. dozerSep 26, 2011
IMG_1274.jpg
Footing FrameThe footings holes will each be 1 meter wide by 1 meter long by 1 meter deep. The footing frame is placed in 35 cm of concrete at the bottom of each footing hole. This is a pic of 5 of them stacked on top of each other.dozerSep 26, 2011
IMG_1259.jpg
PlanThe front page of the blueprint package which got a lot of use during the project. dozerSep 26, 2011
IMG_1258.jpg
Nylon String for Column LayoutA nice heavy nylon string to be used in setting up the site layout (location of each column) which works better than the invisible fishing line commonly used. dozerSep 26, 2011
IMG_1202.jpg
Inner PVC Water LineThe inner PVC water line which is 1" is raised up and lowered into the lined bore hole with the pump on the other side. Note the rope attaches to the pump to aid in lowering it. dozerSep 26, 2011
IMG_1173.jpg
Pump Used for Circulating Water During DrillingThis is the pump used for keeping water circulating during the drilling process. dozerSep 26, 2011
IMG_1228.jpg
PVC Pipe SpecificationsThis was the PVC piping we used. 6" thickness rated at 8.5. dozerSep 26, 2011
IMG_1224.jpg
Hand Scoring the PVC PipesHere the PVC pipe is grooved. The grooved pieces are not used in the first 8 meters (the top most part is non grooved). They are used at the bottom of the well to allow water to seep in and replenish the supply. dozerSep 26, 2011
IMG_1220.jpg
Prescored PVC Gets Thumbs DownThe well digger did not like these prefabricated grooved PVC pipes so we returned them. These are weaker and tend to collapse under pressure.dozerSep 26, 2011
IMG_1210.jpg
Lowing PVC into PlaceHere a grooved section is being lowered into place. dozerSep 26, 2011
IMG_1209.jpg
Cutting PVC for another TryThis was the first well attempt. The lower portion collapsed and was discarded under ground. dozerSep 26, 2011
IMG_1206.jpg
Lining the Bore HolePlacing a scored PVC pipe in the bore hole. dozerSep 26, 2011
943 files on 79 page(s) 78