Last additions - House Construction |

Rough Plumbing LayoutAll of the inbound water pipes (1/2") and drain pipes ready for water pressure test. dozerSep 26, 2011
|
|

Setting Up the PumpBefore getting too far the pump needs to be set up for so the inbound lines can be pressure tested. Any problems can be checked/fixed before concrete is poured over any piping. dozerSep 26, 2011
|
|

Drain Pipes / Inbound WaterAll of the PVC piping is wired into place prior to setting in concrete to prevent it from angling during the pour. dozerSep 26, 2011
|
|

PVC Pipe LidsAll PVC piping is covered to prevent concrete or other blockage from getting in it. Also the covers allow the inbound lines to be pressure tested. dozerSep 26, 2011
|
|

Shower Enclosure BeamA ground beam is set up to be poured where the shower enclosure will go. dozerSep 26, 2011
|
|

1 and 1/2 bathroomsThe view of the beam setup for 1 and 1/2 bathrooms. dozerSep 26, 2011
|
|

Leveling the Toilet PipeAny of the piping which doesn't come up vertical straight causes problems with fittings and attachments. The pvc is leveled and will be secured in place prior to the pour of concrete.dozerSep 26, 2011
|
|

Partially Dug SepticThe seepage tanks here will be 1.2 m wide cement rounds with an exterior of stone aggregate. dozerSep 26, 2011
|
|

Inbound Water TestDuring the inbound water pressure test the only place one should see any moisture is at the lids if they haven't be glued in place. dozerSep 26, 2011
|
|

Drain Water TestThe other end of the drain pipe is capped and tested for all drain pipes prior to pouring of any concrete. dozerSep 26, 2011
|
|

Setting Toilet DrainSetting the toilet at the correct distance per the plan. dozerSep 26, 2011
|
|

Toilet Drain with Vent OpeningThe elbow has the all important vent opening which will be vented up through the roof and prevent sluggish toilet syndrome. dozerSep 26, 2011
|
|