Bird GuardThe bird guard is installed on the inside of the fascia board.dozerSep 27, 2011
|
|
Finished Roof TilesOne finished section of the roofing. Notice that the ridge tiles have not been affixed with any concrete per the dry tech method. dozerSep 27, 2011
|
|
Dry Tech at the Ridge CornerThe final layer of dry tech material being laid in place at the ridge corner. dozerSep 27, 2011
|
|
Dry Tech at the RidgeThe dry tech along the ridge. There are two levels of material which sit on an aluminum rail. dozerSep 27, 2011
|
|
Dry Teching the RidgeThe first layer of dry tech material is fitted on an aluminum rail on the ridge line by the dry tech installer. dozerSep 27, 2011
|
|
Dry TechThe two layers of dry tech materials being set in place by the installer. dozerSep 27, 2011
|
|
Prefab Valley MaterialThis is the chang prefabricated valley material as installed in a roof valley (shown from the inside). dozerSep 27, 2011
|
|
Angle Cutting TilesTiles are angle cut to fit into one of the the roof valleys . dozerSep 26, 2011
|
|
Lifting Tiles into PlaceThe tile guys are lifting the tiles into place and setting them on the battens. dozerSep 26, 2011
|
|
Plastic SheetingPlastic sheeting is laid down no top of the 20 mm plywood walkway to protect it from rain.dozerSep 26, 2011
|
|
Interior of Roof StructureA shot of the interior of the roof structure with the tile battens in place.dozerSep 26, 2011
|
|
Fixing Roof LevelAny areas of the roof that are 'slightly out of shape' as declared by the roofing engineer must be rectified by welding in a 1 by 1 inch riser to correct the level of the roof batten.dozerSep 26, 2011
|
|